Consider using the following as a release acceptance criteria checklist:

  • Build succesfully from a blank environment.
  • All Unit tests must pass (e.g. a stock-build of the top-level project works without errors).
  • Te load.bat/csh script must successfully load the dev environment into a database.
  • The integration tests must pass running against a database/server containing the stock dev environment.
  • The mojo integration tests must pass running against an empty test database.
  • The "entire" snapshot/full SNOMED loads must complete without running out of memory on a machine with 8GB of RAM in reasonable time.
  • Deployment server UI works.
  • Deployment server Swagger API loads.
  • Documentation is updated (as needed)

Performing a Maven Release

...